You don't have javascript enabled. Good luck with that.
Pencarian
 MRT Jakarta Lakukan Uji Coba SAT dari Lebak Bulus Ke Cipete Raya

MRT Train with Route Lebak Bulus-Cipete Raya Trialled

PT Mass Rapid Transit (MRT) Jakarta today is conducting system acceptance test (SAT) or trial towards MRT Jakarta train with route Lebak Bulus-Cipete Raya.

Yesterday we did trial at Lebak Bulus Depot, and now its route is extended to Cipete Raya Station

PT MRT Jakarta President Director, William Sabandar stated this trial is a continuation of previous trials, Thursday (8/9). 

First MRT Jakarta Train Tested

"Yesterday we did trial at Lebak Bulus Depot, and now its route is extended to Cipete Raya Station," he expressed, Saturday (8/11).

It is done by running train on the up-track lane towards HI Roundabout Station and will move to the down-track lane from HI Roundabout Station to Lebak Bulus Station.

"We hope it can be done successfully like yesterday," he explained.

In its operation, the train uses the communication based train control (CBTC) signaling system that is controlled from the operation control center (OCC) room by Traffic Dispatcher.

"The strength of this signaling system allows setting the time span between counters on the main route," he stated.

Linked News
Popular News indeks
  1. Jakarta Council Begins Deliberations on New Population and Housing Bylaws

    access_time21-08-2026 remove_red_eye1933 personFakhrizal Fakhri
  2. Pramono Vows to Prioritize Jakarta’s Strategic Development

    access_time22-08-2026 remove_red_eye1025 personDessy Suciati
  3. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye720 personBudhi Firmansyah Surapati
  4. Pramono Pushes for Partnership Between New Toto Tentrem and Tarakan Hospitals

    access_time24-08-2026 remove_red_eye640 personDessy Suciati
  5. New LRT Jakarta Route Set for Official Launch on August 26

    access_time22-08-2026 remove_red_eye500 personDessy Suciati