You don't have javascript enabled. Good luck with that.
Pencarian
 MRT Jakarta Lakukan Uji Coba SAT dari Lebak Bulus Ke Cipete Raya
.
photo Wuri Setyaningsih - Beritajakarta.id

MRT Train with Route Lebak Bulus-Cipete Raya Trialled

PT Mass Rapid Transit (MRT) Jakarta today is conducting system acceptance test (SAT) or trial towards MRT Jakarta train with route Lebak Bulus-Cipete Raya.

Yesterday we did trial at Lebak Bulus Depot, and now its route is extended to Cipete Raya Station

PT MRT Jakarta President Director, William Sabandar stated this trial is a continuation of previous trials, Thursday (8/9). 

First MRT Jakarta Train Tested

"Yesterday we did trial at Lebak Bulus Depot, and now its route is extended to Cipete Raya Station," he expressed, Saturday (8/11).

It is done by running train on the up-track lane towards HI Roundabout Station and will move to the down-track lane from HI Roundabout Station to Lebak Bulus Station.

"We hope it can be done successfully like yesterday," he explained.

In its operation, the train uses the communication based train control (CBTC) signaling system that is controlled from the operation control center (OCC) room by Traffic Dispatcher.

"The strength of this signaling system allows setting the time span between counters on the main route," he stated.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye966 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye778 personBudhi Firmansyah Surapati
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye445 personFolmer
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye410 personTiyo Surya Sakti
  5. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye351 personBudhi Firmansyah Surapati